Great Value launches its new premium flats in noida by the name of “Sharanam”. This project is located in Sec.107, Noida. The project enjoys the easy accessibility to major hubs of the city.
As the name “Sharanam” itself says that the project provides a beautiful place which purifies your soul. The apartments are designed to exhilarate your inner soul. It is just like the recreational destination for your family. Every building has been designed to maximize air circulation and sunlight reach.
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminium (Power Coated/ Anodised) /UPVC with glazing
OBD
--
2.
Master bedroom & Children bedroom
Laminated Wooden Flooring
OBD
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminium (Power Coated/ Anodised) /UPVC with glazing
OBD
--
3.
Other Bedroom
Vitrified Tiles/ Laminated Wooden Flooring
OBD
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminium (Power Coated/ Anodised) /UPVC with glazing
OBD
4.
Kitchen
Ceramic tiles / Vitrified Tiles
2' high ceramic/ vitrified dado above counter & rest OB
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminium (Power Coated/ Anodised) /UPVC with glazing
False Ceiling/ OBD
Granite/Marble top working counter, SS/ quartz sink
5.
Toilets
Ceramic tiles
Designer ceramic tiles up to 7' high
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminum (Power Coated/ Anodized) /UPVC with glazing
False Ceiling/ OBD
Counter/designer washbasin, English WC, Mirror, Good quality CP fittings
6.
Study/Servant Room
Ceramic tiles / Vitrified Tiles
OBD
Hard Wood frame with flush shutter in teak finish / Skin Moulded Door
Aluminium (Power Coated/ Anodised) /UPVC with glazing
OBD
--
7.
Balconies/Terraces
Ceramic tiles/kota stone
Cement Paint
--
Aluminium (Power Coated/ Anodised) /UPVC with glazing
White wash
--
8.
Corridors/Lobby
Kota/Marble Stone/ Tiles
OBD
--
and Fire Staircase
Marble/kota stone
--
Price List
BSP @ Rs. 4500 * / sqft.
Particulars
Category
Type I
Type II
Type III
Type IV
Type V
Type VI
DD/ 2 BR/Kitchen/2 Toilets/Bal.
DD/ 2 BR/Study/ Kitchen/2 Toilets/Bal.
DD/ 3 BR/Kitchen/3 Toilets/Bal.
3BR -4T -Study
DD/ 4 BR/ Study / Kitchen/ 4 Toilets/ Bal.
DD/ 4 BR/ Study / Kitchen/ 4 Toilets/ Bal.
Super Area (in sq ft)
Basic Rate/sq.ft.
1095 sq.ft.
1250 sq.ft.
1575 sq.ft.
1710 sqft.
2185 sq.ft.
2800 sq.ft.
Construction Linked Plan in INR
Rs. 4500/-
4,927,500
5,625,000
7,087,500
7,695,000
6,118,000
12,600,000
Down Payment Plan in INR (10 % Discount)
Rs. 4050/-
4,434,750
5,062,500
6,378,750
7,695,000
8,849,250
11,340,000
Floor Premium (Part of BSP)
Ground Floor
Rs. 150/- per sq ft
First Floor
Rs. 100/- per sq ft
Second, ThirdandFourthFloor
Rs. 75/- per sq ft
Fifth ,SixthandSeventhFloor
Rs. 50/- per sq ft
*The prices can be revised without any notice at sole discretion of the Company.
P.N.(1) The above areas are tentative and subject to change. (2) All areas are in sqft(3) 1 Sq mt = 10.764 sqft
Extra Charges
1. Interest Free Maintenance Security
Rs. 20/- per sqft.
2. One Time Lease Rent
Rs. 100/- per sqft. (payable within 30 days of allotment)
3. External Electrification Charges
Rs. 50/- per sqft.
4. Fire Fighting Charges
Rs. 50/- per sqft.
5. Power Back-up
Rs. 15,000/-per K.V.A.(Proposed back-up 4 K.V.A per unit)
6. Club Membership
Rs. 1 Lakh
7.Car Parking
Rs. 3 Lakh
Type
Independent
Twin Type (One behind another)
Basement
2,50,000/-
4,00,000/-
8. Preferential Location Charges (Part of BSP)
% of Basic Price
3%
5%
Tower C, F,O,L
Unit No. 1 & 3
-
Tower A, B, E, I, N,R
-
Unit No. 1 & 3
Payment Plan
Down Payment Plan(10% Discount)
Sr No.
Payment Stages
Basic %
Other Charges %
1.
At the time of Booking
10%
2.
Within 30 days of Booking
90%
+ 100% Of One Time Lease Rent & Car Parking
3.
At the time Possession
100%OF OTHER ADDITIONAL CHARGES, EEC, FFC, IFMS, CLUB MEMBERSHIP, POWER BACKUP
Construction Link Payment Plan
Sr. No.
Payment Stages
Basic %
Other Charges %
1
At the time of booking
10%
2
Within 30 days from Booking
10%
+ 100% of One Time Lease Rent
3
On start of Excavation
10%
4
On Completion of Ground floor slab
10%
+ 25% of Car Parking
5
On Completion of 2nd floor slab
7.50%
6
On Completion of 6th floor slab
7.50%
+ 25% of Car Parking
7
On Completion of 10th floor slab
7.50%
8
On Completion of 14th floor slab
7.50%
+ 25% of Car Parking
9
On Completion of 18th floor slab
7.50%
10
On Completion of Top floor slab
7.50%
+ 25% of Car Parking
11
On Completion of Brick work
5%
12
On Completion of Electrical Conducting
5%
13
At the time of possesion
5%+ 100% of EEC, FFC, IFMS, CLUB MEMBERSHIP, POWER BACKUP
Flexi Payment Plan (4 % Discount) (Self Funding Scheme)
Sr. No.
Payment Stages
Basic %
Other Charges %
1.
At the time of Booking
10 %
2.
Within 30 days of Booking
40 %
+100 % of time one lease rent
3.
On start of excivation
10 %
+25 % of car parking
4.
On completion of Ground floor slab + 25 % of car parking
10 %
+25 % of car parking
5.
On completion of Second floor slab + 25 % of car parking
10 %
+25 % of car parking
6.
On completion of Sixth floor slab + 25 % of car parking
5 %
+25 % of car parking
7.
On completion of Nibth floor slab
5 %
8.
On completion of Tenth floor slab
5 %
9.
At the time of possession
5 %
+100 % of EEC, FFC, IFMS, Club Membership, Power Backup
Notes:
A. Prices at which units will be booked will remain firm.
B.Any additional facility that may be provided shall be charged extra.
C. Prices & payment plans can be revised at the sole discretion of the company & without prior notice.
D. Please read the detailed terms & conditions in the allotment agreement.
E. For Car Parking the price prevailing on the date of booking of the bay will be applicable.
F. Variations in the final layout and floor plans can be effected without any claim from the allottee.
G. One Parking compulsory. Any allottee opting for 2 parkings will be allotted twin type parking.
H.Units having lawn & terrace areas would be charged extra @ Rs.1200/- per sqft.
I. The area mentioned above may vary and the same shall be adjusted at rate prevalent on the date of booking. For variation beyond + 10%, the allottee shall have an option to cancel and take full refund.
J. The above installment shall be payable on demand irrespective of the order in which they are listed.
K. Monthly Maintenance Charges will be intimated later.12 month's maintenance charges shall be payable in advance and 24 months PDC's (starting from 13th to 36th month)
L. All discounts in Down Payment Plan would be adjusted at the time of the payment of the second installment .
M. Service Tax / Any other Taxes as applicable shall be payable in addition to the above mentioned as and when they occur.
Real Estate | Sale Property | Buy Property | Real Estate Dealer | Property in Delhi | Property in NCR | Commercial Property in Noida | Residential Property in Gurgaon | Office Space in Gurgaon | Real Estate Property | Villas in Gurgaon | Flats in Gurgaon | Luxury Villas in Noida | Apartments in Noida | Real Estate NCR | Real Estate india | Luxury Flats in Gurgaon | Luxury Apartments in Gurgaon
Best Real Estate Company | Real Estate Consultants.
Connect to us-:
Copyright 2010 - 2011 Sumangalam Propmart Pvt. Ltd. All rights reserved